{"id":5384,"date":"2020-03-09T09:13:57","date_gmt":"2020-03-09T12:13:57","guid":{"rendered":"https:\/\/www.nachodelatorre.com.ar\/mosconi\/?p=5384"},"modified":"2020-03-09T09:13:57","modified_gmt":"2020-03-09T12:13:57","slug":"robot-de-carga-para-el-us-army","status":"publish","type":"post","link":"https:\/\/www.fie.undef.edu.ar\/ceptm\/?p=5384","title":{"rendered":"&#8220;Robot de carga&#8221; para el US Army"},"content":{"rendered":"<p>El US ARMY se encuentra en la etapa final de evaluaci\u00f3n del sistema de \u201cMula Robot\u201d que a partir del 2024, ser\u00eda provisto a nivel Escuadra (Grupo de tiradores). Cuatro grandes empresas compiten en el desarrollo de este UGV, destinado a llevar parte del peso que hoy cargan los soldados, teniendo como requerimiento una capacidad de carga de 450kg y autonom\u00eda de 100 km, as\u00ed como un sistema motor de muy baja sonoridad.<\/p>\n<hr \/>\n<div class=\" mco-body-item mco-body-type-text\">\n<p class=\"element element-paragraph\">WASHINGTON \u2014 The Army has renewed a competition to acquire a robotic mule for light infantry after it canceled its <a href=\"https:\/\/www.defensenews.com\/land\/2019\/10\/31\/heres-the-robotic-vehicle-that-will-carry-equipment-for-us-troops\/\" target=\"_blank\" rel=\"noopener noreferrer\">previous award<\/a> following a protest.<\/p>\n<\/div>\n<div class=\" mco-body-item mco-body-type-text\">\n<p class=\"element element-paragraph\">The service posted a new Request for Proposals (RFP) on Feb. 14, allowing the four finalists in the original competition to recompete for a chance to build its Small Multipurpose Equipment Transport (SMET) ground robotic vehicle. (The original name for the program was the <a href=\"https:\/\/www.defensenews.com\/digital-show-dailies\/ausa\/2017\/10\/09\/robotic-vehicle-can-lighten-soldiers-loads-for-long-duration-patrols\/\" target=\"_blank\" rel=\"noopener noreferrer\">Squad Multipurpose Equipment Transport)<\/a>.<\/p>\n<\/div>\n<div class=\" mco-body-item mco-body-type-text\">\n<p class=\"element element-paragraph\">General Dynamics Land Systems\u2019 Multi-Utility Tactical Transport, or MUTT, won the original contract to build SMET at the end of October 2019, but Textron, one of the other three companies to compete for the chance to build the system, filed a protest with the Government Accountability Office over the award.<\/p>\n<\/div>\n<div class=\" mco-body-item mco-body-type-text\">\n<p class=\"element element-paragraph\">In the protest, Textron claimed GDLS had been allowed to change its vehicle significantly following a soldier evaluation phase, which made the evaluation invalid even though an award was contingent on such an assessment from users.<\/p>\n<\/div>\n<div class=\" mco-body-item mco-body-type-text\">\n<p class=\"element element-paragraph\"><a href=\"https:\/\/www.defensenews.com\/land\/2017\/12\/14\/four-companies-advance-to-build-armys-equipment-transport-ground-robot\/\" target=\"_blank\" rel=\"noopener noreferrer\">Four companies were chosen from a larger pool in 2017<\/a> to compete to build the robotic vehicle: GDLS, a <a href=\"https:\/\/www.defensenews.com\/unmanned\/2019\/04\/24\/can-this-tracked-robot-haul-as-much-as-a-mule-and-as-quietly-as-a-bear\/\" target=\"_blank\" rel=\"noopener noreferrer\">Textron offering from its subsidiary Howe &amp; Howe<\/a>, a team of Applied Research Associates and <a href=\"https:\/\/www.defensenews.com\/land\/2018\/02\/07\/polaris-rolls-out-equipment-transport-ground-robot-the-mrzr-x\/\" target=\"_blank\" rel=\"noopener noreferrer\">Polaris Defense<\/a>, and HDT Expeditionary Systems. Each team built 20 platforms issued to infantry brigade combat teams for testing and analysis.<\/p>\n<p class=\"element element-paragraph\">The Army terminated the program in December before the GAO made a ruling and said it planned to hold a new competition among only the four systems downselected as finalists in the previous competition.<\/p>\n<p class=\"element element-paragraph\">According to the RFP, those four companies will have a chance again to compete, under revised evaluation criteria.<\/p>\n<div class=\" mco-body-item mco-body-type-text\">\n<p class=\"element element-paragraph\">The systems were originally assessed using four factors: soldier feedback, system reliability, system delivery and cost and price. The new evaluation will rely on two factors, the RFP notes, which are a \u201cPhase III System Design\u201d and cost and price.<\/p>\n<\/div>\n<div class=\" mco-body-item mco-body-type-text\">\n<p class=\"element element-paragraph\">\u201cThe driving rationale for the change in the criteria was based on consistent feedback from soldiers during mission exercises regarding the noise signature of the systems, specifically the generators and powertrain,\u201d the RFP states. \u201cFurthermore, payload and operation range in silent mode are essential characteristics of the system based on the intended use of the S-MET amongst Light Infantry and were also determined to be of great criticality.\u201d<\/p>\n<\/div>\n<div class=\" mco-body-item mco-body-type-text\">\n<p class=\"element element-paragraph\">The RFP explains the system reliability factor was removed because of \u201ca lack of recorded hours.\u201d<\/p>\n<div class=\" mco-body-item mco-body-type-text\">\n<p class=\"element element-paragraph\">The Army plans to award one 5-year Indefinite Delivery\/Indefinite Quantity (IDIQ) production contract to buy both new and refurbished systems procured under the prototyping effort.<\/p>\n<\/div>\n<div class=\" mco-body-item mco-body-type-text\">\n<p class=\"element element-paragraph\">The award, according to the RFP, will come in May 2020 and systems will be delivered through October 2024, with all vehicles fielded by the following October.<\/p>\n<\/div>\n<div class=\" mco-body-item mco-body-type-text\">\n<p class=\"element element-paragraph\">The service\u2019s target price per system is $112,000 with a maximum ceiling for the contract set at $249 million, according to the RFP.<\/p>\n<\/div>\n<div class=\" mco-body-item mco-body-type-text\">\n<p class=\"element element-paragraph\">GDLS\u2019 initial contract totaled $162.4 million to produce 624 vehicles with the contract wrapping up in October 2024. Delivery was to begin in the second quarter of fiscal 2021.<\/p>\n<\/div>\n<div class=\" mco-body-item mco-body-type-text\">\n<p class=\"element element-paragraph\">The Army has been working through the acquisition of a vehicle that can carry about 1,000 pounds worth of soldier equipment for many years. The goal is to lighten the load of nine soldiers across an infantry squad. The Army wanted the robots to be able to travel 60 miles over three days and to be able to provide a spare kilowatt hour of power while moving and at least 3 kilowatt hours while stationary.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<p>Fuente: <a href=\"https:\/\/www.defensenews.com\/land\/2020\/02\/18\/after-protest-army-launches-new-competition-for-robotic-mule\/\" target=\"_blank\" rel=\"noopener noreferrer\"><em>https:\/\/www.defensenews.com<\/em><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>El US ARMY se encuentra en la etapa final de evaluaci\u00f3n del sistema de \u201cMula Robot\u201d que a partir del 2024, ser\u00eda provisto a nivel&hellip; <\/p>\n","protected":false},"author":1,"featured_media":5385,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[18,11,2],"tags":[],"_links":{"self":[{"href":"https:\/\/www.fie.undef.edu.ar\/ceptm\/index.php?rest_route=\/wp\/v2\/posts\/5384"}],"collection":[{"href":"https:\/\/www.fie.undef.edu.ar\/ceptm\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fie.undef.edu.ar\/ceptm\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fie.undef.edu.ar\/ceptm\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fie.undef.edu.ar\/ceptm\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5384"}],"version-history":[{"count":0,"href":"https:\/\/www.fie.undef.edu.ar\/ceptm\/index.php?rest_route=\/wp\/v2\/posts\/5384\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fie.undef.edu.ar\/ceptm\/index.php?rest_route=\/wp\/v2\/media\/5385"}],"wp:attachment":[{"href":"https:\/\/www.fie.undef.edu.ar\/ceptm\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5384"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fie.undef.edu.ar\/ceptm\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5384"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fie.undef.edu.ar\/ceptm\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5384"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}